S Ossetia gas pipeline launched

The 163-km long pipeline will rise to over 3000m above sea level, and it is planned to be completed by the end of 2007. At the moment, South Ossetia receives gas through territory controlled by Georgian authorities, and the region is keen to remove this dependence.

Leave a Reply

Your email address will not be published. Required fields are marked *

Send this to a friend