Lanzhou – Chengdu pipeline begins construction

The 878 km, 610 mm diameter pipeline will have a design pressure of 8-13.4 MPa, a capacity of 10 MMt/a of crude oil and be constructed using X65 SSAW pipe.

The project is expected to be put into operation in 2012.

Leave a Reply

Your email address will not be published. Required fields are marked *

Send this to a friend