The proposed 1,100 km pipeline has a challenging technical dimension because at a particular point, its depth will be over 3,500 m – considerably deeper than any subsea pipeline that has been constructed to date.
Oman Ambassador Sheikh Humaid Bin Ali Bin Sultan Al-mani said “According to the previous feasibility study, the gas pipeline is very costly, technically speaking. I do hope that if the technical aspects are overcome, we will be able to implement such projects. It would be good for India’s energy security.”