The scope of works to be completed includes the design, construction and installation of a 27 km, 6 inch diameter gas lift pipeline and a 27 km, 12 inch diameter oil production pipeline to one of DPE’s existing offshore processing facilities, along with a basic, unmanned offshore wellhead platform.
Global Offshore intends to utilise the newly built Global 1200 construction vessel to carry out the project.