Attendees will have the opportunity to gain insight into industry, with three dedicated session streams to be presented at the No-Dig Down Under (NDDU) 2022 conference and exhibition.
Read More
Choosing the right large-diameter HDD for your next project
Choosing the right horizontal directional drill (HDD) is critical to help maximise your team’s performance on large-diameter bores over long distances. You need to make sure you’re choosing a drill rig that has the proper torque for the ground conditions and thrust/pullback power to handle the weight of the pipe being installed. You should also consider choosing a drill that will deliver the most efficient results — from transport and setup to project completion — job after job.
Read More
Read More
UEA goes to a new level on river crossing
UEA is one of Australia’s leading trenchless technology contractors, combining state-of-the-art equipment with unmatched expertise and capability.
Read More
Read More
43 km Denmark pipeline completed
Water Corporation’s $25 million Albany to Denmark pipeline in Western Australia will secure the region a year-round water supply.
Read More
Read More
WATCH: Mardi to Warnervale Pipeline recap
Spiecapag has released video detailing the completed Mardi to Warnervale Pipeline (M2WP) Project it completed with Seymour Whyte.
Read More
Read More
Enabling major infrastructure projects
With the Australian Government set to spend $110 billion over the next 10 years on infrastructure programs as part of the National Economic Recovery Plan, a critical path for these large projects is enabling works.
Read More
Read More
HDD construction methodology for river crossings
Maxibor prepares an HDD Construction Methodology document to provide a comprehensive overview of the processes involved in the physical delivery of major projects and demonstrate how key activities and issues specific to the project are to be managed.
Read More
Read More
Pullback completed in NT
Spiecapag and subsidiary HDI Lucas have successfully completed the pullback at the APA Group Channel Island Bridge Pipeline replacement project.
Read More
Primus Line celebrates 20 years
Radlinger primus line GmBH was officially founded in 2001 and the company is commemorating the milestone with a look back at its history.
Read More
Read More
WATCH: Channel Island Bridge Pipeline update
Spiecapag and HDI Lucas have released a video update of their work on the APA Group Channel Island Bridge Pipeline replacement project.
Read More
Ask an expert – Maxibor
Rodney O’Meley is the owner and CEO of Maxibor, one of Australia’s leading specialists in horizontal directional drilling (HDD).
Read More
Read More
Moving forward in pipeline technology
Every year, around 380 km of new pipelines are installed worldwide using Herrenknecht technology.
Read More
Read More
Investigating pipeline corrosion management and prevention technologies
This paper provides an overview of recent major research and development activities from the Energy Pipeline Cooperative Research Centre.
Read More
A leading BRANDT for the industry
As market leaders in oil and gas, National Oilwell Varco (NOV) has been manufacturing shakers and centrifuges, its flagship products, for more than five decades – longer than many companies have even been in operation.
Read More
Read More
Featured APGA Member: Maxibor
Maxibor is a leading provider of horizontal directional drilling (HDD) design and installation services across numerous sectors around Australia.
Read More
Read More
ARENA announces hydrogen microgrid funding
The Australian Renewable Energy Agency (ARENA) has announced $2.6 million in funding for Australia’s first remote microgrid using renewable hydrogen generation in Western Australia.
Read More
Read More
Two driving forces unite
TRACTO-TECHNIK Australia’s GRUNDORAM range of pipe ramming hammers have long been used by pipeline contractor HDI Lucas.
Read More
Read More
Never compromise on safety
Polyfabrics Australasia are a leading innovator in geosynthetic solutions for the civil engineering, landscape and building construction industries.
Read More
Read More
Vermeer equipment keeps pipeline projects running
When installing pipelines, contractors that can deliver a complete project in the most productive, cost-effective and sustainable way will have a higher chance of securing work.
Read More
Read More
Power Handler proves its worth
The UIS Power Handler is a revolutionary excavator attachment, exclusively distributed in Australasia by Blick Group.
Read More
Read More
kwik-ZIP remains the first choice
kwik-ZIP Spacers and Centralizers® are an easy pipeline solution, adaptable to a wide range of pipeline projects and profiles.
Read More
Read More
Innovative Herrenknecht technology is a shore thing
Herrenknecht’s Direct Pipe® technology continues to become a more common method employed for pipeline installation thanks to its efficient approach and ecological sensitivity.
Read More
Read More
Achieving laser focus on pipeline projects
With many of the projects required to be placed precisely on-grade, Vermeer has developed a pit-launched trenchless solution to provide pinpoint accuracy without sacrificing productivity.
Read More
Read More
Primus Line proves to be the prime choice
A 1.8 km section of Primus Line® was installed in Queensland for the rehabilitation of some significant water infrastructure assets.
Read More
Read More
WATCH: Gas pipeline installed under Brisbane River
APA Group has completed the installation of a gas pipeline, 905 m of which runs under the Brisbane River.
Read More
Read More
2009: Queensland becomes the east coast gas hub
The global financial crisis (GFC) had kicked up a gear with the threat of economic instability poised to impact the nation’s economy.
Read More
Read More