Construction of the $2.8 billion Alkimos seawater desalination plant (ASDP) has reached another significant step with the arrival of Australia’s largest registered jack‑up barge.
Read More
The Australian Renewable Energy Agency (ARENA) has announced a $13 million funding package to support five projects aimed at cutting emissions across Australian industry.
Read More
The Waitsia Gas Plant in Western Australia’s Perth Basin has reached a major milestone, ramping up production to 200 terajoules per day (TJ/day) following the successful commissioning of its third compressor.
Read More
Australian pipeline spacer manufacturer kwik‑ZIP has supplied key pipeline support systems for the Cairns Water Security Stage 1, a major project designed to strengthen long-term drinking water supply for the growing city of Cairns.
Read More
Hunter Water has completed major upgrades to the Harpers Hill Reservoir and a connecting pipeline, boosting water storage capacity and strengthening supply reliability for communities across the Lower Hunter.
Read More
For senior participants in the east coast gas market, the debate is no longer whether there is a supply challenge – it is what is realistically achievable in the next 5–10 years, what remains aspirational, and which policy settings will determine price and contract outcomes.
Read More
APA Group has welcomed the Australian Energy Regulator’s (AER) final decision on its Basslink revenue proposal. The final decision provides total revenue of $459.5 million for a four-year period from 1 July 2026 to 30 June 2030.
Read More
Tamboran Resources has reported significant operational and financial progress for the second quarter ending 31 December 2025, underscoring momentum across its Beetaloo Basin program and corporate developments into early 2026.
Read More
Construction has begun on a $7.6 million water infrastructure project in Forbes aimed at strengthening the town’s drought resilience and improving water reliability for more than 7000 residents.
Read More
Beach Energy has strengthened its strategy to increase gas supply to the Australian domestic market after being awarded three large exploration blocks in the Cooper Basin alongside Santos.
Read More
Beach Energy is sharpening its role as a major supplier of affordable, reliable domestic gas, investing billions to bring new supply online and strongly advocating for policy settings that restore confidence across Australia’s east coast market.
Read More
TasWater has completed a major upgrade of ageing water mains beneath Hobart’s central business district, replacing World War II-era pipework.
Read More
STATS has successfully completed a challenging project involving a hot tap and line stop isolation on a 33bar operating system, allowing for the safe replacement of two 6″ Slam Shut valves while maintaining uninterrupted gas supply at Beeston Above Ground Installation (AGI) near Nottingham, UK.
Read More
Arrow Energy has marked a major milestone in its Surat Gas Project (SGP), delivering first gas from its northern expansion near Miles, months ahead of schedule.
Read More
Inductabend is making essential improvements to its induction bending services to better align with the needs of Australia’s upcoming pipeline projects.
Read More
Brisbane-based Austrack Equipment is a major supplier and hire company for heavy plant and machinery across Australia, servicing construction, mining, pipeline, agricultural and infrastructure sectors.
Read More
Pipeline technology specialist STATS Group has played a leading role in SGN’s LTS Futures world-first project where a live 18-inch high pressure hydrogen pipeline was safely isolated. Read More
In a first for Woodside, a helicopter equipped with Bridger Photonics’ Gas Mapping LiDAR has taken to the skies above key onshore assets in Western Australia — the Karratha Gas Plant, Pluto LNG and the Pluto–KGP Interconnector — to detect and measure methane emissions.
Read More