Australia hydrogen

Is Australia ready for the next hydrogen phase?

APGA’s 2022 Building Hydrogen Infrastructure Symposium has set the tone for Australia’s renewable energy future, demonstrating that the pipeline and infrastructure industries are ready to take on the infrastructure challenges to come. Read More

APA Group to acquire Basslink

Leading Australian energy infrastructure, APA Group, has announced that it has entered into a deed of company arrangement (DOCA) with regard to the acquisition of Basslink and BPL. Read More

APA Group tapped for Basslink

Pipeline giant APA Group has been named preferred bidder for the sale of the electricity inter-connector Basslink, following a hotly contested six-week auction for the 370 km underwater electricity cable which connects the TAS and VIC grids. Read More
ACCC Origin

Origin Energy CEO clarifies on concerns

Origin Energy’s CEO Frank Calabria has released a statement via social medias clarifying Origin Energy’s role as it relates to the joint venture the company part owns, known as Australia Pacific LNG.
Read More
Parmelia

APA Group is busy on WORM

Construction has begun on APA Group’s Western Outer Ring Main (WORM) gas transmission project to enable larger volumes of gas to be transported to Victoria’s Iona Underground Storage Facility for use during peak demand.
Read More
water pipeline at Kidston gold mine mt beauty

Barwon Water drafts price submission

Barwon Water, Victoria’s largest regional urban water corporation, has proposed $31 million to be spent over the next five years to support the development of water services in specific growth areas in Geelong.
Read More

GAMAA report shows electrifying gas appliances costly

A new report shows the cost for Victorian households to transition their gas appliances to electric appliances could be much more than estimated by the recently released Victorian Gas Substitution Roadmap, said APGA national policy manager Jordan McCollum.
Read More