The construction process for different pipelines is largely similar. It begins with the pipeline easement being cleared and graded to ensure that there is an unobstructed path for the pipeline. This is followed by trenching, which involves ploughing a ditch in the earth into which the pipeline will be laid.

Lengths of pipe are organised alongside the trench in a process called ‘stringing’. This is in preparation for welding, which needs to be both fast and accurate.

The freshly welded joint is ground down to ensure a smooth surface and blasted with sand to facilitate coating adhesion before the field joint coating is applied. This acts as a protective barrier between the pipeline and its surrounding environment, preventing corrosion and extending the asset’s lifespan.

The pipeline undergoes weld testing and inspection before being carefully lowered into the trench. Rollers are used to protect the freshly applied coating and a padding machine prevents damage to the pipeline by sifting rocks out of the soft soil which is used to cushion and cover the pipeline. After the pipeline has been adequately covered with soft soil, backfilling occurs, with regular soil pushed back in to fill the trench.

Once the pipeline is installed, hydrotesting is performed, pumping water through the pipeline’s length at a higher pressure than the product in order to test its durability and to ensure there are no leaks. After this has been successfully completed, the pipeline can be placed into service.

Finally, environmental consultants step in to direct resinstatement, restoring the environment along the easement to its original state prior to pipeline construction.
More Less

Latest News

SKILLED secures Ichthys pipeline contract

SKILLED Offshore has signed a Letter of Intent (LoI) with Saipem to provide manning services for the gas export pipeline component of the INPEX Ichthys LNG Project.
 
Drillsearch completes the Bauer to Lycium Pipeline

Drillsearch has completed its 47 km Bauer to Ly...

GLNG Pipeline boring set to commence at Gladstone Harbour

The 277 t boring machine that will tunnel under...

More
 

Related Companies

Mitchell Water Australia Pty Ltd
West Melbourne, VIC, Australia
 
Michels Australia Co. Pty Ltd
Brownsville, WI, USA
 
Welding Industries of Australia
Melrose Park, SA, Australia
 
Pipe and Buoy Australia Pty Ltd
Slade Point, QLD, Australia
 
Serimax
WA, Australia
 
More

Related Events

APIA WA Chapter Dinner

Parmelia Hilton
 

APIA Brisbane Seminar

Brisbane Hilton
 
More

Basket is empty.
 

Advertisement Advertisement Advertisement Advertisement