APC’s newly patented unit allows clients to start site operations with a totally self contained core camp plus a fully equipped kitchen within 10 minutes of being unloaded.
Just turn the genset on, and the unit is ready to start professionally operating a main or a fly camp, with a state of the art equipped kitchen that has a walk-in fridge and freezer that allows the storage of weekly food supplies.
The comfortable air-conditioned dining room can seat 21 and has a refrigerated salad area as well as a hot bain-marie. The laundry area has three large 7.5 kg washers and dryers and the unit is also equipped with a 150 kg storage hopper ice machine and new state of the art wastewater treatment system.
APC’s newly patented effluent “A” system allows clients to meet all stringent EPA laws and requirements when working in sensitive areas. The unit also features a 6000 litre potable water storage tank and a 2000 litre reverse osmosis purified potable water storage for drinking and cooking. This system provides drinking water of a better quality than the expensive bottled water that is the norm for project camps. The inline water softener takes away all the hardness of any bore or other type of water and also has an automatic pH and water chlorinator system.
Article continues below…
The silenced generator provides a stable power supply for up to 45 air-conditioned rooms plus other camp amenities and buildings.
A 600 litre diesel tank, gas bottles for the cooking appliances and a pressuring water system that keeps up to 40 showers available simultaneously are also part of this unit’s features.
This unit has been designed and built after lengthy research into the needs of small camps. For a crew of 10 to 35 people, this camp eliminates the need to look for generators, a sewerage system, water purification or filtration, kitchen or dining room - APC has all these items in a single unit ready to be shipped or relocated at short notice.
Drilling rigs, exploration camps, small pipeline crews such as clearing and grading, restorations or even hydro testing crews can now operate comfortably and be self sufficient.
Following the positive feedback that the new APC unit has received, it will soon be a permanent fixture in the Australian bush, from the mines of the harsh west to the pipelines of far north Queensland.
For anyone embarking on a new small project or wanting to upgrade an existing one this is a must see. It offers the total solution as well as saving on installation costs, mobilisation and relocations.
APC prides itself on their innovative approach to the problems facing small projects and always focus on areas that offer maximum efficiency and cost saving while meeting stringent H&S requirements and EPA regulations.


Basket is empty.






